Revamping Alphington Community Centre: A Look at Our Latest Project in Exeter
- Daniel Fifield
- May 3, 2024
- 1 min read
For the past few months, our team of engineers has been working diligently at the Alphington Community Centre to install a new drainage system. The project involved the replacement of the old, worn-out drainage pipes with new, high-quality, and durable ones.

Our engineers utilised the latest technology and equipment to ensure that the installation was carried out to the highest standards. Throughout the project, our team worked closely with the management of the Community Centre to minimise any disruptions to the facility's operations. We ensured that the work was carried out efficiently and effectively, without compromising on safety or quality. The new drainage system is designed to handle the high volume of water that the Community Centre experiences during heavy rainfall, reducing the risk of flooding and water damage.
The new system is also more environmentally friendly, as it is designed to recycle and reuse rainwater, reducing the Centre's reliance on the mains water supply. Our team takes pride in completing the project on time and within the budget. We are confident that the new drainage system will provide a long-lasting and reliable solution for the Centre's drainage needs.
Get in touch with our engineering team in Exeter today for more information!




Comments